Kitchenette and Pond Infill
Cooking Facilities and Creating Safe Spaces
This £15,000 project consisted of maximum utilisation of existing space to create and install a new kitchenette, the infill of a previously fenced off pond and new perimeter fencing.
Challenge
The school wanted a functional kitchenette area to aid the provision of breakfast club and food technology lessons for the children. The pond whilst a feature was a loss of usable safe playground space for the children. We project managed the installation of both the kitchen and the infill of the pond along with providing replacement perimeter fencing and a new boiler house door.